2012 Terminals - Pelican Point ($7M)

Site establishment on a greenfields site, earth and civil works, plateau preparation, design and construction of 871 bulb based piles (2600m3), construction of 8 different size (38m, 31m, 25m, 20m, 14m & 5.5m diameter * 0.6m to 1.1m deep) concrete pile caps (leanmix, reinforcement, form, pour 4000m3) with fabtec sealing strip, FRP containment walls and slab to smaller tank, install asphalt to top of all concrete tanks bases. Static compression & dynamic pile testing of bulb based piles.